• Gresser Employs 300 of the Most Qualified tradesmen anywhere
  • Design-Build, Budgeting, Value Engineering
  • Masonry: Brick, Block and Stone of any type on Projects of Any Size
  • 25 Telescopic boom fork trucks
  • More than a half mile of scaffolding if placed 16 feet high
  • Capable of placing masonry units at 400 feet above street level with in stock scaffolding
  • More than 2,000,000 units placed in 2006
  • Concrete: Slab on grade, Slab on deck, Post-Tensioned, Vertical and Structural concrete of any type and size
  • 4 Somero Laser Screeds
  • 6 Laser Grading Systems
  • More than 40 Troweling Machines
  • Nearly 100,000 square feet of form work material in stock
  • More than 130,000 cubic yards of concrete placed in 2006

Home About Us Contact Us Join our team Site Map